None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#39 Manual run by Andrey Volk

#40 Manual run by Andrey Volk

1 build

15 minutes

  • Average time to fix a failure: 15 minutes
  • Average number of builds between fixes: 1 builds
  • The longest time taken to fix a failure is 15 minutes, from failure starting in build #39.
  • The greatest number of builds taken to fix a failure is 1, from failure starting in build #39.