None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#6 Manual run by Andrey Volk

#7 Manual run from the stage: Upload Binaries by Andrey Volk

1 build

12 minutes

  • Average time to fix a failure: 12 minutes
  • Average number of builds between fixes: 1 builds
  • The longest time taken to fix a failure is 12 minutes, from failure starting in build #6.
  • The greatest number of builds taken to fix a failure is 1, from failure starting in build #6.