None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#14 Manual run by Serj Serj

#15 Manual run from the stage: deploy by Serj Serj

1 build

38 minutes

  • Average time to fix a failure: 38 minutes
  • Average number of builds between fixes: 1 builds
  • The longest time taken to fix a failure is 38 minutes, from failure starting in build #14.
  • The greatest number of builds taken to fix a failure is 1, from failure starting in build #14.